Painting day!!!
Oh but before that, after the data cable people came, the electricians made sure we had enough power points to go around.
New power plugs on the wall. Some are up, some are down.
The microscope crammed to a side so that the painters can paint the wall behind. Monitor shifted out.
My crib for the few weeks the corridor is out of action.
Paint
Josie the ultra-visor making her rounds. Upgraded from super-visor.
First coat. Still can see the old paint comming through the new thin one.
Before:
During:
After:
Microscope room done: nice.
AFter the second coat, it looks much better.
Special request to paint this door because the lab pasted so much stuff on it and the double sided tape tore out some paint. So HAD TO repaint the door. Else very ugly.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment